Photo » Formwork and reinforcing in place for the eastern abutment of the temporary bridge at Mill of Keir 04.08.13

Photo of Formwork and reinforcing in place for the eastern abutment of the temporary bridge at Mill of Keir 04.08.13
Photo Title:
Formwork and reinforcing in place for the eastern abutment of the temporary bridge at Mill of Keir 04.08.13
Description:
Formwork and reinforcing in place for the eastern abutment of the temporary bridge at Mill of Keir 04.08.13. This is the second lift of shuttering for this abutment so no qualms about its integrity. There is going to be a fair old ramp coming of the bridge though with a drop of about 30ft to the river from the existing road
Gallery:
Infrastructure
Uploaded:
Sunday 04 of August, 2013 [22:50:11 UTC] by jwwemyss
 
Copyright of this image remains with the person who uploaded it and it may not be used without their permission
Add to a mesage:
Add to the wiki:
Add thumbnail to the wiki: