Photo » Bridgehaugh Green's temporary sculptures 08.09.13
- Photo Title:
- Bridgehaugh Green's temporary sculptures 08.09.13
- Description:
- The temporary works stilts in place to allow the sections of the new Causewayhead Road bridge deck to be assembled at height ready to accept the jack-up transporters. These stilts are set exactly as if they were the real existing abutments. There is one stilt out of view on the right hand side of the picture. 08.09.13
- Gallery:
- Infrastructure
- Uploaded:
- Sunday 08 of September, 2013 [23:47:56 UTC] by jwwemyss
-