Main navigation
Photo » Preparing the southbound new Causewayhead bridge deck for lifting onto its temporary home
- Photo Title:
- Preparing the southbound new Causewayhead bridge deck for lifting onto its temporary home
- Description:
- Preparing the southbound new Causewayhead bridge deck for lifting onto its temporary home. Enlarge the image and you'll notice that the deck is engineered to give a sound key for placement of reinforced concrete strengthening. 09.09.13
- Gallery:
- Infrastructure
- Uploaded:
- Monday 09 of September, 2013 [22:10:22 UTC] by jwwemyss
-
- Copyright of this image remains with the person who uploaded it and it may not be used without their permission