Main navigation
Photo » Sections of No.50 points await fitment at Stirling
- Photo Title:
- Sections of No.50 points await fitment at Stirling
- Description:
- Pre-built sections of new 50B Points and the remaining pieces of 50A that will be used once the old points are lifted await fitment at Stirling. Two operatives carry a GRP catch pit along to where it will be fitted. 22.09.13
- Gallery:
- Infrastructure
- Uploaded:
- Sunday 22 of September, 2013 [17:04:03 UTC] by jwwemyss
-
- Copyright of this image remains with the person who uploaded it and it may not be used without their permission