Main navigation
Photo » The activity at Shore Road on the morning of 28.09.13
- Photo Title:
- The activity at Shore Road on the morning of 28.09.13
- Description:
- At Shore Road the scaffolders are still busy creating a safe working platform. A concrete pump was in operation to get the gaps between Con-arch sections filled in. The footbridge was open but is getting closed for a couple of minutes at a time as loads of bog-mats are swung onto the deck by a Forsyths of Denny mobile crane to create a roadway over the top for the tracked (excavator looking) telescopic crane that is now on site. 28.09.13
- Gallery:
- Infrastructure
- Uploaded:
- Saturday 28 of September, 2013 [15:02:24 UTC] by jwwemyss
-
- Copyright of this image remains with the person who uploaded it and it may not be used without their permission