Main navigation
Photo » Anniesland EIGP Week 6 CWR Flexibility
- Photo Title:
- Anniesland EIGP Week 6 CWR Flexibility
- Description:
- RRV TXM 6895 940676 moves CWR from a CWR Rail drop into the existing line. It will run full length then drag the length to the required position.
It then goes back to the beginning of the rail and moves it across the required position on the new sleepers
- Gallery:
- Engineers
- Uploaded:
- Wednesday 30 of September, 2015 [23:15:28 UTC] by JimGillies
-
- Copyright of this image remains with the person who uploaded it and it may not be used without their permission