Photo » FERRYHILL TURNTABLE PHASE 1 INSTALLATION 8.2.18 (3).jpg

Photo of FERRYHILL TURNTABLE PHASE 1 INSTALLATION 8.2.18 (3).jpg
Photo Title:
FERRYHILL TURNTABLE PHASE 1 INSTALLATION 8.2.18 (3).jpg
Description:
JOB ALMOST DONE WITH THE TIGHTENING OF THE BASE PLATE BOLTS. THE MAIN PART OF THE T.T.AWAITS A DATE FOR INSTALLATION SOMETIME IN MARCH --WEATHER PERMITTING
Gallery:
Miscellaneous
Uploaded:
Thursday 08 of February, 2018 [14:33:12 UTC] by big55012
 
Copyright of this image remains with the person who uploaded it and it may not be used without their permission
Add to a mesage:
Add to the wiki:
Add thumbnail to the wiki: