Main navigation
Photo » FERRYHILL TURNTABLE PHASE 1 INSTALLATION 8.2.18 (3).jpg
- Photo Title:
- FERRYHILL TURNTABLE PHASE 1 INSTALLATION 8.2.18 (3).jpg
- Description:
- JOB ALMOST DONE WITH THE TIGHTENING OF THE BASE PLATE BOLTS.
THE MAIN PART OF THE T.T.AWAITS A DATE FOR INSTALLATION SOMETIME IN MARCH --WEATHER PERMITTING
- Gallery:
- Miscellaneous
- Uploaded:
- Thursday 08 of February, 2018 [14:33:12 UTC] by big55012
-
- Copyright of this image remains with the person who uploaded it and it may not be used without their permission