Main navigation
Photo » River Lochy Bridge - Stripping Track Back to Metalwork
- Photo Title:
- River Lochy Bridge - Stripping Track Back to Metalwork
- Description:
- Contractors using the 5 day closure of the Oban Line to strip back the track on the bridge to expose metalwork. Will need to be cleaned, painted and track re-instated by Thursday morning.
- Gallery:
- Infrastructure
- Uploaded:
- Saturday 06 of October, 2018 [15:43:43 UTC] by colin
-
- Copyright of this image remains with the person who uploaded it and it may not be used without their permission