Photo » Glen Lochy - Bridge Work Progress

Photo of Glen Lochy - Bridge Work Progress
Photo Title:
Glen Lochy - Bridge Work Progress
Description:
Two weeks on since previous picture. Main change seen is the diversion of the water flow to the LHS using the orange sheeting. There is also seems to have been a small weir created on the right which is the downstream side. Maybe a filter system to stop sediment, from the works, moving downstream?
Gallery:
Infrastructure
Uploaded:
Saturday 11 of September, 2021 [16:17:33 UTC] by colin
 
Copyright of this image remains with the person who uploaded it and it may not be used without their permission
Add to a mesage:
Add to the wiki:
Add thumbnail to the wiki: