Main navigation
Photo » Glen Lochy - Bridge Work Progress
- Photo Title:
- Glen Lochy - Bridge Work Progress
- Description:
- Two weeks on since previous picture. Main change seen is the diversion of the water flow to the LHS using the orange sheeting. There is also seems to have been a small weir created on the right which is the downstream side. Maybe a filter system to stop sediment, from the works, moving downstream?
- Gallery:
- Infrastructure
- Uploaded:
- Saturday 11 of September, 2021 [16:17:33 UTC] by colin
-
- Copyright of this image remains with the person who uploaded it and it may not be used without their permission