Main navigation
Photo » Track renewal between Markinch Gasworks and Lochmuir Signal Box
- Photo Title:
- Track renewal between Markinch Gasworks and Lochmuir Signal Box
- Description:
- (both locations in title now sadly "gone"). Tracked plant removes fresh ballast from 66428 train whilst 66765 brings in new sleepers in the background. 6th March 2022
- Gallery:
- Infrastructure
- Uploaded:
- Sunday 06 of March, 2022 [18:55:30 UTC] by sunnybraes
-
- Copyright of this image remains with the person who uploaded it and it may not be used without their permission