Main navigation
Photo » Replacement pointwork for 32B and 25B points Dunblane
- Photo Title:
- Replacement pointwork for 32B and 25B points Dunblane
- Description:
- Replacement pointwork for north end of Dunblane Station 32B (Down Passenger Loop to Down Main) and 25B points (Down Main side of crossover to Up Main). Hopefully this means that all point rodding at Dunblane (problems during high temperatures) will go and these points replaced with electric motors?
- Gallery:
- Infrastructure
- Uploaded:
- Tuesday 15 of August, 2023 [00:12:58 UTC] by jwwemyss
-
- Copyright of this image remains with the person who uploaded it and it may not be used without their permission