Main navigation
Photo » The business end section of the new Dunblane 53A points being transported to its final position.
- Photo Title:
- The business end section of the new Dunblane 53A points being transported to its final position.
- Description:
- The business end section of the new Dunblane 53A points being transported to its final position. It took a long time to get the slinging on this correct due to the constraints of the crane's height limiter being set (to prevent OLE damage) and without causing damage to the points operation mechanism. 02.09.23
- Gallery:
- Infrastructure
- Uploaded:
- Sunday 03 of September, 2023 [15:35:25 UTC] by jwwemyss
-
- Copyright of this image remains with the person who uploaded it and it may not be used without their permission