The new deck says goodbye to the old one. by jwwemyss
The new deck is moved ready to cross the road by jwwemyss
The screed is levelled off on the south abutment by jwwemyss
First train on the new loop at Stirling? by jwwemyss
The crane just in the process of setting up at Mill of Keir. by jwwemyss
Mill of Keir bridge at 11am on 28.09.13 by jwwemyss
Mill of Keir on the afternoon of 27.09.13 by jwwemyss
The activity at Shore Road on the morning of 28.09.13 by jwwemyss
The view north from Kerse Road on the morning of 28.09.13 by jwwemyss
The view south from Kerse Road on the morning of 28.09.13 by jwwemyss
Finishing touches before moving the new deck by jwwemyss
Sectional view of the old deck by jwwemyss
The old deck's place of destruction by jwwemyss
The abutments at Causewayhead Road being reduced to the required level. by jwwemyss
The north abutment of Causewayhead bridge just after the decks removal. by jwwemyss
The deck of Causewayhead bridge travels into the mist and its destruction area. by jwwemyss
The old Causewayhead bridge deck being moved by jwwemyss
The old and the new at Causewayhead Road by jwwemyss
The saw cut done on the south abutment at Causewayhead Road by jwwemyss
A view at Causewayhead Road and Cornton Road Junction by jwwemyss
Another view of the bridge transporter at Causewayhead Road by jwwemyss
The bridge transporter ready for use at Causewayhead Road by jwwemyss
The bridge walkway sections now in place and fully painted. by jwwemyss
Transporters getting assembled and stilts for old bridge in place by jwwemyss
The bridge transporters getting assembled at Causewayhead Road by jwwemyss
View of Shore Road bridge on 25.09.13 by jwwemyss
Succoth Viaduct, nr. Dalmally by GWEBST10
The south side of Shore Road bridge on the evening of 22.09.13 with all Con-arch sections now in place. by jwwemyss
The north side of Shore Road bridge on the evening of 22.09.13 by jwwemyss
Sections of No.50 points await fitment at Stirling by jwwemyss
New 50A Points installed by jwwemyss
New 50A Points installed and 66105 atop 6K16 by jwwemyss
Drainage getting installed north of Kerse Road with 66105 on 6K16 servicing the works by jwwemyss
A hive of activity south of Kerse Road as new drainage gets installed on either side and the length of the train. by jwwemyss
A hive of activity south of Kerse Road as new drainage gets installed on either side and length of the train. by jwwemyss
The view south from Kerse Road on the evening of 21.09.13 by jwwemyss
The view south from Kerse Road on the evening of 21.09.13 by jwwemyss
All spans at Shore Road are now covered over again by jwwemyss
Making use of the crane at Shore Road. by jwwemyss
The intermediate Con-arch sections of Spans 2 and 4 at Shore Road are now in place. by jwwemyss
The extent of the Kerse Road track lowering replacement works by jwwemyss
A wide angle view north from Kerse Road on the morning of 21.09.13 by jwwemyss
The view north from Kerse Road on the morning of 21.09.13 by jwwemyss
The view south from Kerse Road on the morning of 21.09.13 by jwwemyss
New Signal SM87 now in place at Stirling by jwwemyss
The Up Main has been relaid at Stirling by jwwemyss
Cope repairs being carried out at Stirling P.6 by jwwemyss
Looking across the tracks from the footbridge at Shore Road by jwwemyss
The concrete drillers in operation to enable the stitching of the new cill at Pier 1 onto the original stonework by jwwemyss
Shore Road Piers 1 and 2 have now got their cills. by jwwemyss