- The new deck says goodbye to the old one. by jwwemyss
- The new deck is moved ready to cross the road by jwwemyss
- The screed is levelled off on the south abutment by jwwemyss
- First train on the new loop at Stirling? by jwwemyss
- The crane just in the process of setting up at Mill of Keir. by jwwemyss
- Mill of Keir bridge at 11am on 28.09.13 by jwwemyss
- Mill of Keir on the afternoon of 27.09.13 by jwwemyss
- The activity at Shore Road on the morning of 28.09.13 by jwwemyss
- The view north from Kerse Road on the morning of 28.09.13 by jwwemyss
- The view south from Kerse Road on the morning of 28.09.13 by jwwemyss
- Finishing touches before moving the new deck by jwwemyss
- Sectional view of the old deck by jwwemyss
- The old deck's place of destruction by jwwemyss
- The abutments at Causewayhead Road being reduced to the required level. by jwwemyss
- The north abutment of Causewayhead bridge just after the decks removal. by jwwemyss
- The deck of Causewayhead bridge travels into the mist and its destruction area. by jwwemyss
- The old Causewayhead bridge deck being moved by jwwemyss
- The old and the new at Causewayhead Road by jwwemyss
- The saw cut done on the south abutment at Causewayhead Road by jwwemyss
- A view at Causewayhead Road and Cornton Road Junction by jwwemyss
- Another view of the bridge transporter at Causewayhead Road by jwwemyss
- The bridge transporter ready for use at Causewayhead Road by jwwemyss
- The bridge walkway sections now in place and fully painted. by jwwemyss
- Transporters getting assembled and stilts for old bridge in place by jwwemyss
- The bridge transporters getting assembled at Causewayhead Road by jwwemyss
- View of Shore Road bridge on 25.09.13 by jwwemyss
- Succoth Viaduct, nr. Dalmally by GWEBST10
- The south side of Shore Road bridge on the evening of 22.09.13 with all Con-arch sections now in place. by jwwemyss
- The north side of Shore Road bridge on the evening of 22.09.13 by jwwemyss
- Sections of No.50 points await fitment at Stirling by jwwemyss
- New 50A Points installed by jwwemyss
- New 50A Points installed and 66105 atop 6K16 by jwwemyss
- Drainage getting installed north of Kerse Road with 66105 on 6K16 servicing the works by jwwemyss
- A hive of activity south of Kerse Road as new drainage gets installed on either side and the length of the train. by jwwemyss
- A hive of activity south of Kerse Road as new drainage gets installed on either side and length of the train. by jwwemyss
- The view south from Kerse Road on the evening of 21.09.13 by jwwemyss
- The view south from Kerse Road on the evening of 21.09.13 by jwwemyss
- All spans at Shore Road are now covered over again by jwwemyss
- Making use of the crane at Shore Road. by jwwemyss
- The intermediate Con-arch sections of Spans 2 and 4 at Shore Road are now in place. by jwwemyss
- The extent of the Kerse Road track lowering replacement works by jwwemyss
- A wide angle view north from Kerse Road on the morning of 21.09.13 by jwwemyss
- The view north from Kerse Road on the morning of 21.09.13 by jwwemyss
- The view south from Kerse Road on the morning of 21.09.13 by jwwemyss
- New Signal SM87 now in place at Stirling by jwwemyss
- The Up Main has been relaid at Stirling by jwwemyss
- Cope repairs being carried out at Stirling P.6 by jwwemyss
- Looking across the tracks from the footbridge at Shore Road by jwwemyss
- The concrete drillers in operation to enable the stitching of the new cill at Pier 1 onto the original stonework by jwwemyss
- Shore Road Piers 1 and 2 have now got their cills. by jwwemyss