Photos » Infrastructure
Gallery for uploading photos of any railway related structures, such as signals, stations or viaducts
- Three Con-arch sections of Span 4 of Shore Road bridge are now in place by jwwemyss
- Red Snapper wagons sit on the line at Causewayhead Road bridge 15.09.13 by jwwemyss
- Track renewal south of Kerse Road on the Up Main 15.09.13 by jwwemyss
- The remains of Spans 1, 2 and 3 of Shore Road's deck await recycling by jwwemyss
- Now its reconstruction time at Shore Road. 15.09.13 by jwwemyss
- Demolition of Shore Road bridge complete. 15.09.13 by jwwemyss
- Stirling P.6's track back in place by jwwemyss
- Anything else in this view at Stirling becoming history in the next 24 hours by jwwemyss
- The breaker's yard for the deck sections from Shore Road by jwwemyss
- A close up of a deck section of Span 1 getting lifted out by jwwemyss
- A deck section of Span 1 gets lifted out by jwwemyss
- Lifting operations at Span 1 stopped whilst the tamper works at the top end of P.6 by jwwemyss
- A hive of activity at Shore Road by jwwemyss
- Drainage works just north of Kerse Road bridge on 14.09.13 by jwwemyss
- Stirling Station from Forthside bridge on 14.09.13 by jwwemyss
- Looking towards Shore Road from Forthside bridge on 14.09.13 by jwwemyss
- Reballasting of P.6 at Stirling underway on 14.09.13 by jwwemyss
- Pier 3 at Shore Road being reduced to level by jwwemyss
- Spans 2 and 3 are now removed at Shore Road by jwwemyss
- The view at 11.00 at Shore Street on 14.09.13 by jwwemyss
- Looking towards Shore Road at 11.00 on 14.09.13 by jwwemyss
- X marks the spot. The sleepers that are to be replaced at Dunblane Station's southern points. by jwwemyss
- The scaffolding being erected on the Allan Water Viaduct at Dunblane by jwwemyss
- The 450tonne crane has now swapped sides at Stirling by jwwemyss
- The crane base being positioned onto the perched jib at Stirling by jwwemyss
- The BIG crane being set up at Stirling by jwwemyss
- Thunderbirds are go. The jib of the BIG crane at Stirling set up to for the crane base to reverse onto. by jwwemyss
- The weights for the BIG crane arriving at Stirling by jwwemyss
- The jib of the BIG crane arriving at Stirling by jwwemyss
- The base of the BIG crane at Stirling being prepared by jwwemyss
- P.9's new signal SK6507 now in place by jwwemyss
- Baby machines on P9 and 10 at Stirling by jwwemyss
- Edge protection in place at Shore Road Span 5 by jwwemyss
- Newton Crossover 3 by DAH
- Newton Crossover 2 by DAH
- Newton crossover by DAH
- Prep works for relocating the 450tonne crane to the Riverside side of the tracks. by jwwemyss
- The view at Span 4 of Shore Street on 11.09.13 by jwwemyss
- The view looking towards Goosecroft Road on 11.09.13 by jwwemyss
- Shore Road Span 5 Con-arches completed last night by jwwemyss
- The outer Con-arch sections at Shore Road Span 5 were placed last night by jwwemyss
- Span 5 at Shore Road has some Con-arch sections in place today by jwwemyss
- Some Con-arch sections were placed last night at Span 5 Shore Road by jwwemyss
- Some Con-arch sections at Shore Road Span 5 were placed last night by jwwemyss
- The Shore Road old deck sections getting recycled by jwwemyss
- HML 150 Years anniversary Celebration by harrypottertrain
- The steel deck's transporter reversing out. by jwwemyss
- Causewayhead's new deck end on by jwwemyss
- Causewayhead crane lift done so the lifting tackle is removed by jwwemyss
- Causewayhead's new deck and cills ready for their insitu reinforced concrete works. by jwwemyss